[sc:projectdata client=”Ministry of Education” architect=”Hay and Associates” contractperiod=”6 months”]
Tahunanui School Pool
Tahunanui School Board of Trustees decided to invest in an upgrade of the school pool. The contract involved removing the existing pool and construction of the structural floor and walls along with surrounding landscaping and fencing. A new liner, pump and filter equipment were then installed. As Main Contractors we had to programme and liaise carefully with the specialist pool trades to ensure correct methodology and careful detailing.